Cospar 3 - Banner

NASA to perform countdown rehearsal of SLS

Vehicle Assembly Building (VAB). Credit: NASA / Cory Huston

Edinburgh / Washington, 16 March 2022. – NASA said it was ready to roll out the Space Launch System (SLS) rocket tomorrow for a fueling and countdown rehearsal. 

The SLS with Orion mounted on it will be transported from the Vehicle Assembly Building (VAB) at the Kennedy Space Center to Launch Complex 39B. It will take approximately 11 hours for the spacecraft to reach the pad. SLS will spend a few weeks at the pad to undergo tests and a practice countdown dubbed “wet dress rehearsal”. During this, the core stage of the rocket will be filled with liquid hydrogen and liquid oxygen propellants. 

The fueling process will take eight hours for the SLS as its upper stage also has to be filled with propellants. Countdown will stop before the core stage’s four RS-25 engines could ignite. This will be the final major rehearsal before the Artemis 1 mission launches.

After the wet dress rehearsal, NASA will carry out post-test operations and servicing before transporting the rocket back to the VAB for the final launch preparations. The agency will set the launch date for Artemis 1 depending on how the tests and the rehearsals go in the coming weeks.

Check Also

OroraTech

OroraTech Selected as One of XPRIZE’s Top 20 Finalists

In a significant step toward leveraging technology to combat wildfires, OroraTech has announced the XPRIZE Foundation has selected it as one of 20 finalists in the prestigious XPRIZE Wildfire Competition in the Space-Based Wildfire Detection & Intelligence track, moving on to the final round of the competition.